Renovations

New cam 014
Bathroom reno

Complete bathroom renovation due to mold and outdated.

Mold removed and structure stabilized and re-supported.

New vanity and sink, new corner storage unit, new fixtures and lighting.

Floor tiled. Glazing of tub and surrounding wall tile.

20130201_120508
Kitchen Renovation

Complete gutting of  a kitchen.

Replacement of cupboards, flooring, countertops and sink, fixtures, dishwasher, microwave mount, drywall repairs and baseboards.

Bob Lennox renos after (8)
Condominium

Toronto high-rise renovation.

Laminate flooring added to solarium balcony.

Ceramic tiling of fireplace with tv mount added to wall, including re-wiring.

Repaint of entire apartment with new baseboards added.

Boston After (4)
Dining Room and Kitchen

Complete kitchen renovation, gutted to the studs.

Drywalled.  Tiled floor and backsplash.

Baseboards, new cupboards, crown moulding added.

New countertops with undermount sink, fixtures added.

Microwave mounted, dishwasher added under countertop.

Wiring, lighting replaced.

Window replaced new.

photo-2
Sherskton Deck

Deck extension to a cottage home/trailer.

Angled steps with added handrail.

New Sienna brown pressure treated wood used.  (Looks like cedar but less expensive.)